Essential Pillars of Efficacious Claims in Construction Disputes - 10 Jul 2019 07:46

Tags:

The construction industry is full of surprises and shocks for the contracting parties. It is because slight negligence can cause a considerable disturbance in the successful completion of the projects. The requirement of such precision is considerably higher in developed countries such as the UAE.
Owing to this reason, the builders have to show serious concern regarding the on-time completion of the projects. It not only helps them to maintain their reputation of timely delivery as well as to avoid the disputes.
The article, however, is aimed to provide you with adequate information about claims and its major components or pillar for further proceedings.

What is a construction claim?

You may have heard this many times in the construction industry in particular. However, it is imperative to understand the meaning, significance, and scope of the claim for better clarity. The construction claim is referred to as the process of demanding compensation for a reason or negligence made by any involved party or change in order.
Many contractors are of the view that claim is a dirty word that can ruin the reputation of the contractors. It is valid to some extent. Owing to this reason, various contractors hire the services of construction claims consultants Dubai to resolve such bottlenecks for eliminating the risks of projects abandonment.

What is the Procedure of handling claims?

The procedure of claim management starts with a formal notice. It is usually referred to as ‘condition precedent to entitlement’. Imperatively, the issuing party should consider sending the notification as per the standardized rules and regulations to mitigate the risks of further misunderstandings.

arcadis.jpg

What are the essential components or pillars of claims?

Claims can be formal or informal, and you should understand that any objection made by any project party does not fall under the category of formal claim unless the notice is issued. Contracting individuals claim to realize that something went against the mentioned clauses of the contract.

For instance, if the project owner makes a change in the pre-defined architecture of the project, then the builder can ask for time extension leading to a claim in the budget also. In another case, if the owner gets to know that the contractor has delayed the project owing to some personal commitments, in such a situation, the project owner can make a claim.
Once, the claim is issued, the following components must be present to prove the authenticity of the claim:

The Cause:

As the name indicates, the cause is the main reason for which the dispute is raised. For this, it is imperative to describe the event that triggered a conflict among the contracting individuals. It can be related to environmental factors that caused delay, the non-serious attitude of the contractor or lack of proper support by the owner.

The Effect:

The cause and effect go hand in gloves because when an event occurs, there must be some conseq2uence of that particular happening. So, when the claim is made, it is essential to point out the impact of an event that leads to a conflicting situation among the contracting parties.
The Entitlement and Substantiation:
Entitlement is referred to the statutory legal or contractual entitlement to which you can make a claim. Substantiation is the records of contract and construction proceedings that enabled the individual to claim available ground to prove his stance.

Takes Away

Construction claims are complicated as no one can be sure about the success. However, the presentation of claims makes a significant difference. It is therefore essential to support your claims with adequate evidence. For this reason, you may get assistance from professional construction claims consultants Dubai to avoid mistakes in the selection of dispute resolving methods and presentation process.

More Relevant Posts:
Handy Ways To Handle Concurrent Delay In A Residential Project

Essential Aspects Of Financial Models Prepared By Experts

Essential costs to include when preparing for variation claims - Comments: 0

Essential costs to include when preparing for variation claims - 01 Jun 2019 07:12

Tags:

When you are planning and starting a construction project, then you need to be mentally prepared that there are going to be changed along the way. Rarely there are cases when the construction projects go precisely planned to the T. Most of the construction projects have the changes, delays, and work, which is totally different from what was initially planned.
But there is one thing that keeps on adding up with every change that is made, and that is the cost of the project. However, when it comes to changes and variation, then a claim can be filed for additional charges. Most people are not aware of the claim process and what to add in the claim.

When you are not aware, then instead of putting things on the risk it is essential to have the insight from the professionals. If you are in need of professional advice while being in UAE, then look out for the experienced construction claims consultants in Dubai so that you can have a better understanding of the claim process.
When it comes to variation, then the opinions of people are different like which cost to include because that is the most important one. This article is going to share information on the costs to add when you are all set for variation claims.

++ Essential variations claim costs for the construction projects:

For the completion of project resources and funds are must so if you are spending out of pocket, then reimbursement is a must. There are some costs which the contractors are entitled to claim, and most of the expenses are usually reimbursed. It all comes down to how variation claims are put together because the poorly drafted claim will get you nothing.
One has to be smart when drafting construction claims for variations, especially related to cost. There are some essential costs which everyone has to take into account for filing the variation claims and following are some of the costs:

construction-litigation.jpg

++ Labor cost:

This is the first thing because if you are not paying proper wages to the workforce, then it will result in conflict. If the workers have to work extra because of the change, then it will be counted in the overtime cost.
Equipment cost:
The change will not require extra hours of work, but it will need extra pieces of equipment and machinery. The equipment will include the elements of operators, fuels, lubricants, services and spare parts which were used when required.

++ Material cost:

This is also big costs which should be the part of variation claims because if it includes transportation, extra material, testing material, wastage, and even the fixings. The material cost will be added per unit and the used one according to the market price.

++ Take away!

Variation claims should be devised with great care because one thing wrong will ruin the entire claim. When you are trying to make sure that the cost used for variation should be reimbursed, then you would want to have the expert advice on that.
When in UAE you can have the expert advice from the professional construction claims consultants Dubai for filing the variation claims, including the essential costs. Make sure the claim has all prices included you have spent. - Comments: 0

Essential Aspects Of Financial Models Prepared By Experts - 06 May 2019 12:17

Tags:

Models have always been an important part of evidence and the investigative analysis when it comes to in court proceedings. Similarly, in the case of construction claims it important to draw up the right financial model.

The critical nature of effective models and their ability to assist in the study makes it all the more important to hire the best expert witnesses for the investigation.

Opt for the best quantum expert to assist with the quantum investigation of construction claims who ensure that the documents presented are right according to the expectations of the tribunals. Read on to know the essentials of the reports.

Essential Aspects Of Financial Models

Financial models remain extremely important as part of the quantification of any damages. The model needs not to be too complicated or too simple. The nature of the model, whether complex or simple, depends upon the case in question. Read below to know more about the essential principles of creating a financial model for quantum reports:

Caution Is Important

Due to the complicated and multifaceted nature of the financial models, extreme caution is required when preparing them for reports which will be needed to estimate the quantum losses.

Financial Model Needs Validation

The models are based on an assumption which is why they need to be proved, through experts preparing the reports, other experts or witnesses.

Ensure The Simplistic Design Of Financial Models

The structure of the model should be simplistic and explained as simply as the calculation constraints allow. The data being used should be relevant to the case, and any irrelevant data should be avoided entirely.

Ensure A Logical Flow Of The Model

The financial model should follow a logical structure. As critical as the structure of claims documents is, it's important for the financial report to be structured, organized and arranged in a way that allows minimal supervision and explanations.

The structure itself should be able to convey the contents of the financial report.

Ensure The Dynamic Nature Of The Model

The financial model should also be dynamic. A dynamic model is one which is suitable for different scenarios. It should be possible to implement different inputs in the same model and scenarios to generate different outputs.

Include Written Explanations

However self-explanatory and simplistic the model, it should also include written explanations. The verbal explanations are not only helpful in the most complicated of cases, but they also help experts in understanding models.

Keeping the essentials in mind, the final model created provides the tribunal maximum utility. Although the court and any laymen may not be able to use the model to check its effectiveness, the experts should be able to assess its accuracy.

The opposing experts can study the model and agree on it after careful analysis. This allows the court comfort in knowing that there are no disputes regarding the accuracy or mechanics of the model.

Take Away

Considering the critical nature of the report and the principles it needs to follow, it’s essential to acquire the services of professional quantum experts to help out. The best in their fields not only have the required professional certifications, but also the experience that allows them to be capable of preparing and presenting the most accurate financial reports.

- Comments: 0

Handy Ways To Handle Concurrent Delay In A Residential Project - 17 Apr 2019 10:56

Tags:

Home is often a dream for many people across the globe, but the structure of a home is usually based on the dreams the family has been realizing for years now. The residential construction projects in UAE are at the peak because of the acceptability of every culture and being in rapidly developing regions.

The construction of a residential project takes up to 2 years depending on the floors, design and overall complexity. But often the time is a lot more because the project faces a lot of delays and resulting in getting off track. Often the project managers are not able to handle one delay whether excusable or not, but if there are two different delays occur at the same time, then it can literally put everything on hold for an unexpected period of time. When two delays occur at the same time at that time they are known as concurrent delays.

concurrent delays

Read to know more about concurrent delays!

Management of one delay by the owners and the contractors is pretty much double the hassle and put everything out of control. However, if they are handled strategically, then it is not as complicated to manage them as one would have thought off. Not everyone has the capacity and the required knowledge to handle the delay so professional help will be great at that moment. If you are looking for experienced professionals, then services of delay expert should serve your problem right.

There are a number of ways concurrent delays can be handled, and this article is going to discuss some of those.

Tips For Managing Concurrent Delays In The Residential Project Like A Pro

Concurrent delays are the worst thing that can happen to any project because it not only wastes the resources but also disturbs the overall project schedule. When two delays bottle up, then the situation complicates resulting in frustration for the stakeholders impacting the entire project.

Following are some essential ways to manage concurrent delays for a residential project:

Communicate With Every Stakeholder

Most of the delays are manageable if the contractor keeps a healthy line of communication with everyone involved in the project from start to end. With proper communication and collaboration, there is will more productivity and minds trying to solve an issue which might arise.

Evaluate Management Skills

The delays can occur because of the incompetence of the managers and without any prominent leadership skills. When you have one delay after another, then it is time for the contractor or the manager to improve their management skills and check out where they are lacking to restore the progress of the project.

Go Step By Step

When you have two delays at the same time, then you do not need to panic. Instead what you have to do is think strategically of the ways to handle them individually. The strategic process is absolutely essential for this reason because two things cannot be handled as well as they should.

Final Remarks

Delays are inevitable and disliked by everyone but once they are here then dealing with them is essential. If you are someone who is stuck amidst of concurrent delays then taking on the professional services of delay expert is the best you can do. Be bold and handle the difficulties with poise.

- Comments: 0

What Costs Should The Compensation For Delay Damages Include? - 04 Apr 2019 11:30

Tags:

There is often confusion about the costs involved during the resolution of construction claims. When it comes to the compensation of the expenses incurred, what costs need consideration? Should the compensation include only the costs incurred, or should they include a profit element too?

delay costs in construction contracts

The analysis requires an expert witness to weigh in on the matter. The quantum witness is mainly known for his role in the quantification of the damages that needs to be paid to the claimant to bring about the same position for them as before they encountered the damaging event.

Quantum Analysis is based on certain assumptions that are legally communicated through counsels and technically through delay experts. Regardless of the type of assumptions and situations, construction parties rely on the most experienced quantum expert to resolve any quantum issues the projects may be facing. Read on to know more.

Cost-Related Situations

Firstly, only the additional costs make up the damages. These additional costs would not have been incurred by contractors in the absence of the damaging event. In this case, the compensations will be for the directly attributable costs. Which includes site and not other overheads.

Secondly, In case the damage involves any additional un-invoiced work; the compensation will be based on the additional cost contractors would have charged employers.

Thirdly, in case the damages are a result of the inability of contractors to carry out services for other projects, while engaged with performing present contract it is a loss of opportunity. In such conditions, the contractor has damage entitlement to:

  • HQ overheads and
  • To some extent the profit of the lost opportunity

Expert Analysis On Cost Compensations

In the expert's opinion and in case of occurrence of certain situations, the cost included in terms of HQ overheads can only be made part of the damages only if due to the prolonged period of the project, the contractor could not work on projects, which would have allowed absorption of the cost overheads.

In this case a systematic inclusion of HQ overheads isn't required to calculate the damages and contractors should display that it would have earned revenue from the other projects.
Also, it's possible to refer to accounting data that involves identification of these costs, computation of the ratio of direct cost (company level or business unit) and any HQ overheads and to apply the same ratio to additional claimed costs.

In addition, in certain situations, the unabsorbed overheads will not be sufficient for compensation to the contractor. The compensation should include the complete margin lost (HQ overheads and the profit) that the contractor expects to earn from any other projects he was incapable of taking part in and the product of this value and the probability of the contractor winning the contract.

Take Away

The analysis of quantum remains a multitier aspect of construction projects, consequential delays and their compensations, and its performance may only be completely justified in the presence of experts. Opt for the most experienced Quantum experts to determine the right passage for compensation and to make a sound decision.

- Comments: 0

3 Ways Owners can Cause Delays in Construction Projects - 18 Mar 2019 11:11

Tags:

The construction industry of UAE is considered the backbone of the country’s economy. Why not? It is the construction all around that has turned a barren desert into a well-developed infrastructural oriented state. No doubt, the present-day development not only in this country but across the world is an outcome of progress in construction.

Owing to this much importance, construction projects are initiated every now and then. According to recent estimations, the wealth of the UAE is expected to grow more than 51% by the year 2027 that is around Dh5.14 trillion. The statistics strengthen investment in building projects.

However, it has not only increased opportunities but also caused various challenges in the sector. One of these threats is delays in successful completion. The article is intended to explore multiple factors where owners are responsible for causing delays in construction.

delays in construction

Project Owner Triggered Delays In The Construction Industry

Just imagine a pause in the building project, and the name of the contractor will come into your mind for being the culprit. But, it’s not that always builders are responsible for causing delays. Sometimes, project owners or investors become a hurdle between the project and the construction process leading it towards delays.

It is, therefore, essential to consider a pro-active strategy for dealing with such risks by hiring experienced delay expert from the very start days of your contract. Further, get some knowledge of potential cases that can lead the projects to procrastination:

An Unnecessary Helping Hand From Project Owners

It is good to work in collaboration when it comes to construction projects. It is an additional fantastic factor when owners show dedication in helping the contractor, but sometimes, it leads to delays.

The main reason is that the owner’s unnecessary involvement in the construction process disturbs the workflow determined by the builder. So, beware and set some rules for helping each other throughout the building process.

Approval of Modifications before Time Delays

It is another potential reason for delays in construction projects. The main factor is that owners usually approve changes in the project before the time delay occurs. Consequently, building modules and time framework get disturbed leading to disruption and delays.

It is essential to understand that changes should be approved while keeping the working conditions, the availability of labor, and timeline in mind to avoid potential delays in project completion.

Failure to Obtain a Daily Record

Once an owner agrees to the terms of a change order, Navigant suggests that the owner request a daily work report of labor, equipment, and materials from the contractor. Having this information allows the owner to determine if any delays were caused.

Refusal Of Acknowledging Written Notice

It is the most common reason for trigging delays in building projects when a warning is issued by the contractor, but the owner refuses it. A few project owners consider it a trick as they deny to acknowledge the receiving of a noticed sent by the contractor, but it harms the project.

While the contractor makes any modification or requirement through a written notice, the owner must acknowledge it. After doing so, he can consult construction consultants or get the services of professional delay expert to map procrastination.

Final Thought

Summing up, the success of every construction project largely depends on mutual efforts done by the project owners and other involved parties. However, understanding between contractor and owners is a crucial requirement for delay-free project completion.

Don’t forget to clarify each and everything with the project owner, investor and other parties before signing the contract as a construction builder!

- Comments: 0

Nine Tidbits For A Compelling Presentation On The Analysis Of Delays - 23 Feb 2019 11:34

Tags:

The importance of an expert witness in construction claim is often undermined. Form the choice of the schedule analysis methodology and the determination of delays, to the testimonies provided to the fact finders, the delay expert has several critical roles in the resolution of construction claims.

UAE, with its long term construction processes and the multinational nature of its projects sees numerous claim disputes in the construction industry. Regardless of the size of the losses, it’s important that expert witnesses be present to present the case in front of fact finders.

Presenting delay claims is not a task for everyone. Only the most well versed delay expert can perform task and maintain their reputation in the industry. The following article highlights important tidbits of an effective presentation on delay analysis and the importance of delay expert during the process.

delay analysis presentation

How Expert Witness Can Give An Effective Presentation

Expert witness have the important responsibility of presenting schedule analysis to the fact finders based on which they will decide on the liabilities and further proceeding of the court cases. So there is great pressure on the experts to do their best. The following tidbits can ensure effectiveness of the presentation delivered by the schedule experts.

Identify The Importance Of Schedule

It is important to highlight the importance of the schedule and the issues involved when an expert witness presenting delay position to a fact finder (judge, arbitrator, etc.) most of the people in the crowd fail to understand the importance of a schedule. It’s important to educate the audience about the critical path of the project and how delays have occurred.

Create A Story Based On Facts

Highlight the delays and how they affected the schedule in the form of a story. The project schedule design is based on numerous factors and events, and it is essential to document all factual events for evidence. The “storytelling” session should include relevant facts and how the expert determined these facts.

Establish Credibility

On a legal forum, it works for the expert witness if he establishes credibility with the fact finder. The creditability is determined by the sound experience and credentials of the expert along with the opportunities to help the jury understand the facts establishing the conclusion and analysis.

Reinforce Facts Through Evidence

The delay expert should reinforce factual issues through facts that have led to the observations and conclusion of the findings. By citing facts and evidence, the expert witness is doing two things. Reinforcing fact finder’s knowledge and also generates credibility for expert skills.

Know The What And Why Of Schedule Analysis Methodology

The choice of the delay analysis method used contributes towards his ability to respond to the cross-examination during the trial or hearing. Although the method is chosen depends on the type and amount of data available and expert testimony. However, the expert witness must explain why a specific methodology was adopted and no the other.

Understand The Presented Method

The attorney should have a complete understanding of the type of method used and its execution and analysis. Flaws while presenting an expert’s testimony can result in damage to the expert’s credibility.

Convey Message Effectively

To convey the message to the fact finder, it’s important to tailor the message to the audience. This is what follows:

  • An organization of the facts presented by schedule witness and attorney.
  • Analysis of the methodology chosen
  • Graphical representation of the witness’s observations
  • Cross-examination of expert based on the report and any other deposited testimony and oral testimony at the trial

Use Technology Where Needed

The use of technology depends on the type and complexity of the case. Although innovation is welcome, it's essential to steer away from showmanship.

Prepare Or Weaknesses In The Case

The expert may be asked to present the bad facts and weaknesses in the case. So it’s a good idea to prepare for them beforehand.

Conclusion

From identifying the right schedule analysis methodology to presenting the case in front of fact finders to defending the stance, expert witnesses have an important role to play in delay claims. Acquire the services of the top notch delay experts and let the professionals handle with the right qualities and skills handle all the legal hassles of your claim disputes!

- Comments: 0

Global Claims; A Type Of Construction Claims Presentation Method - 26 Jan 2019 12:52

Tags:

The construction industry is an ever blossoming one. So are the relevant technologies and methodologies in determining and resolving claim disputes. Claims in construction are not only an expense in terms of money but time and effort too.

As the UAE develops to accommodate the growing commerce and industry, construction projects are a permanent fixture of the region. What are more common are the claims that may arise during construction projects.

These construction delays may be due to numerous reasons and require the expertise of the right claim consultant. Expert construction claims consultants Dubai in the field can help identify the path ahead to be resolved. The best consultants can weigh in on the resolution techniques and how the claim should be proceeded with.

What You Need To Know About Global Claims

Here is what you need to know about global claims as a type of construction claim. The classic way of presenting claims involves the presentation of claims to the engineer or before courts, or through arbitration which involve logical and rational thinking of effects with their causes.

In case the engineer runs a few days late while delivering the foundation drawings of a project, the delay in the completion of works by 14 days shows the linkage between cause and effect. Global claims are different. Read below, to know how!

How Global Claims Differ From Classic Claims

In present day, however, a more common method of presenting claims termed the "rolled up" claim is being used. It gives little importance to the ultimate linkage between cause and effect. Under the global claim method, causes of loss or delay are combined, and only one delay is listed as the consequence.

In doing so, the linkage between the cause and effect ignores the collective effect of any additional costs or delays. Rolled up claims are considered acceptable when talking about Quantum, financial claims. In the case of delay claims, however, the cause and effect still have to be linked naturally as evidence of the delays and to be used as loss and delay measurements.

As it appears impractical when assigning a sole case to an effect, global claim may be a more plausible method. In case the "rolled up claim" seems appropriate, the events causing it must be described in detail in order to prove that they may have caused the claimed entitlement and the reason for the party is responsible for them.

In order to avoid arguments over global claims, it is advised for contractors and subcontractors to establish a connection between the effects and the cause of all events, which may have led to claims at the time of occurrence.

Presentation Of Claims

Along with the creation of the cause-effect matrix, highlighting significant events causing a delay in the claim text and referencing to the work progress and the effects in other trades. Information relevant to the link suggested between the cause and effect should provide essential details including:

  • Unwritten, oral assumptions based on which the claims have been made
  • The authenticity of the actual tender price, the program and resources.
  • The lack of any explanation due to the disruption and delay suffered.

Submission Of A Global Claim

As discussed above, the contractors or subcontractors present a claim to the engineer, the main contractor or the employer. Professionalism and tidiness in the presentation of the claim is important ad results in better settlement compared to an unprofessional one.

Conducted logically in sections, with each divided into subsections with sufficient required details Generally speaking the most common sections include the basis for claims, the evaluation and other details ready to be contested.

Choice Of The Right Claim Consultant

Choosing the rightly experienced personnel in the field goes a long way in helping to resolve the dispute and techniques involved to counterclaims. Whether through arbitration, litigation or mediation, opting for the best construction claims consultants Dubai can help parties in claims management, claims consulting and to determine how best to counter claims, in order to maintain a long-lasting business relationship all the while.

- Comments: 0

Why Claims Consultants Are Essential Throughout Construction Cycle - 12 Dec 2018 14:00

Tags:

Successful completion of construction projects is the desire of every contractor. However, the road towards completion of the capital projects is extremely twisted as the contractors go through ups and downs to lead toward an end.

It is therefore considered highly essential to hire industry experts for consultation in order to avoid disputes. Nevertheless, many people are still unaware of the importance of expert advice, or they just ignore it altogether.

However, the construction industry in UAE is highly volatile as it requires pro-activeness on the part of contractors to stay ahead in mitigating emerging risks. It is because disputes can soar any time without prior notification but, the parties involved in a project, must be prepared enough to resolve the matters successfully.

construction-claim-cycle.jpg

No doubt, it is the reason that many contractors prefer to have construction claims consultants Dubai by their side to get an expert opinion at the dire need of time. Proper planning, consideration, execution, and guidance are the crucial elements of successful construction projects.

How Consultancy Experts Can Help You In Construction Claim Cycle

Generally, claims are made in the construction industry pertaining to postponement or suspension of work which leads to delay. Not only this, other disputes are related to mismanagement of resources which cause defect after completion. Generally, the cycle of claim management is divided into five phases. Here are the phases of the construction cycle are discussed to explain how consultants can help you better!

The Phase of Identification

It is the first step when the causes of claim are identified on the basis of primary and secondary reasons. The purpose is to distinguish the factors which influenced the project. The role of claims consultant is crucial at this step because once the wrong causes are included in the influencers; the whole project will be impacted as a result.

The Phase of Notification

This step involves the paperwork as all the parties involved are notified through formal documents or letters to make them informed them about claimant argument.

The Phase of Examination

At this stage, the identified factors are examined technically in order to estimate the significance and scope. The process is to evaluate the strength of the claim made by any party against the other.

The Phase of Documentation

Proper documentation is prepared and maintains to keep the record essential for proceeding with claims in the construction sector. Every party has the right to have a separate copy of the documents or can make mutual documentation.

The Phase of Negotiation

At this step, the involved parties meet together in order to figure out potential ways of resolves. The claimants are given a chance to make allegations while the other parties defend the accusations. Again, expert opinion is essential for keeping the discussions to the point and concise.

Final Verdict

To sum up, the construction sector is highly complicated owing to its dynamic nature and scope. However, the probability of conflicts is relatively high in the industry because of the direct interaction between different professionals and experts.

Therefore, it is wise to acquire the services of construction claims consultants Dubai based professionals to avoid conflicts getting into disputes. Many construction owners and contractors support the acquisition of claims experts for peaceful resolution of emerging issues throughout the life cycle of the project.

Remember! Your credibility as a construction contractor is based on how peacefully you tackle the issue during building process – Be wise to plan and don’t forget to consult with experts.

- Comments: 0

Effective Construction Claim Resolution Require Excellent Communication Skills - 15 Nov 2018 09:34

Tags:

The constructions industry is highly complex because of the scope and involvement of the project of a diverse workforce. Therefore, sometimes, issues can occur in the projects owing to lack of understanding the contractual clauses or mishandling the processes. In such a situation the construction claim resolution comes in.

Considering the case of UAE, the industry of construction and capital projects is very important because it is the backbone of the whole economy. All progress in the country is no doubt a gift of building towers, multi-stored residential blocks and much more. In this way, it is simple to understand that when projects are enormous and numerous, the probability of conflicts is also more!

Nevertheless, the role of construction claims consultants Dubai is highly significant in resolving disputes and conflicting matters among the parties involved in capital projects. It can be understood from the fact that the Global Construction Dispute Report of 2018 ranked the Middle East as the third most vulnerable to construction conflicts and arguments. The amount incurred by the disputes stands at $ 91 million for the year 2017 alone.

construction claim resolution

Reasons Why the Consultants for Construction Claim Resolution Must Have Effective Communication Skills

It goes without doubt that communication is the heart of every profession. However, it becomes more crucial when it comes to jobs where human interaction is more frequent. It is because of the inability to convey your message can cause a significant problem on the other end.

Therefore, it is imperative to nurture good communication skills for the effective deliverance of one’s stance clearly and comprehensively. Lets’ consider the reasons that why such skills are significant for construction claim resolution:

Consultation Agents Are Hired To Communicate

Talking specifically about the construction disputes, the hiring of consultants is mainly made to resolve issues through discussions, arguments and counseling. In this way, it is the prime responsibility of the consulting individuals to justify the stance of their clients adequately.

Divide Intricate Concepts

When it comes to resolving the complex issues faced by the contractors in UAE, the services of construction claims consultants Dubai are sought to divide the problem into small resolvable chunks. Nevertheless, it can be done by bringing all involved parties to the table of discussion. In this regard, communication must be eloquent and convincing to offer an easy resolution of the problems.

Avoid Misunderstandings

The professionals with excellent communication skills can help to clear misunderstandings in the minds of disputing parties. They know how to deal with their clients and the ways to convince their opposing parties.

No doubt, construction consultants have a sweet tongue dipped in the expressiveness of effective communication effective construction claim resolution for their clients.

Takes Away

When it comes to the consultancy profession in any industry, the effectiveness of communication is equally important as the professional expertise. Moreover, claims in the construction sector are critical to being resolve peacefully because any misconception or mishandling can cause any party a significant loss. Therefore, it is the prime responsibility of consulting professional to proof their communication skills through their conversations and actions.

Don’t forget to consider these skills besides professional expertise when you are hiring consultants for construction claim resolution!